How to Specify a Façade Lighting Fixture Schedule
A step-by-step checklist for specifying architectural façade lighting: inputs, fixture families, beam angle, colour version, control zones and batch consistency.
GDXC Lighting · Published October 2, 2026 · Updated October 18, 2026 · 3 min read
To specify façade lighting, start with the elevation drawing, washing height and mounting distance, then select the fixture family, beam angle, power, colour version and control method for each zone. Finish with one consolidated BOM that fixes colour temperature and DMX512 addressing notes so project batches stay consistent.
Key points
- Collect the drawing, effect reference and mounting geometry before choosing fixtures.
- Fix the colour version in writing to prevent batch mismatch.
- Plan control zones before assigning DMX addresses.
- One BOM covering all families is easier to quote and install than separate lists.
Step 1 — Collect the real inputs
A schedule built from a rendering alone will fail on site. The useful inputs are:
- the elevation drawing or a clear site photo,
- the surface material and colour,
- the washing height,
- the mounting position and setback distance,
- the effect reference — static wash, building outline or dynamic colour,
- the control expectation,
- the budget range if one exists.
Step 2 — Assign fixture families by job
| Job | Fixture family |
|---|---|
| Even vertical wash | Wall washers |
| Building or bridge outline | Linear lights |
| Long-distance or large-area lighting | Flood lights |
| Landscape and path lighting | In-ground lights |
| Animated colour and dynamic effects | Pixel lights |
A single façade can use several families. That is fine as long as they are specified in one schedule under the same colour and control logic.
Step 3 — Fix beam angle and power
Select beam angle from the washing height and the setback distance. Select power from the surface size and the target brightness. Choosing power first and beam angle later is a common source of hotspots, spill light and wasted energy.
Step 4 — Fix the colour specification
Write the colour temperature, or the RGB/RGBW version, into the schedule. This is the single most effective step against visible batch mismatch. If a project has several phases, record the specification used in the earlier phase so later fixtures can be matched.
Step 5 — Plan control before addressing
Where the project changes colour or runs effects:
- Decide which fixtures need a DMX512 version.
- Group them into control zones based on the animation.
- Confirm channel use with the control equipment supplier.
- Then produce the addressing plan.
GDXC provides addressing guidance and supports multi-channel control for large projects. Fixed channel counts and controller current values are not published because they depend on the chosen hardware.
Step 6 — Issue one BOM
The final document should list every fixture family, quantity, colour version, control version and accessory in one place. It is the basis for a clear quotation and for a batch-consistent production run.
What this service does not include
GDXC does not issue sealed design drawings, perform structural calculations, supply media servers or carry out on-site installation. Those remain with the project’s designer, engineer and contractor.
This article is general guidance for outdoor architectural lighting projects. It is not a substitute for a project-specific review — fixture models, beam angles, control protocols and protection ratings are confirmed against the drawing and the issued quotation.